The TransCanada tower has 38 stories with office occupancy and a major Data Centre located on the sixth floor.  Mechwave assumed the duties of base building engineer in 2008.  Projects include cooling and heating modifications, data centre reliability upgrades and improvements to the building management controls sequence.

Project Data

OwnerH&R Properties Ltd.
Major TenantTransCanada Pipeline
Area89,500 m² (963,000 ft²)