The building is designed with a central chilled water and heating water system. The individual suites are heated and cooled by a fan coil.  Specialty drainage was provided for the green roof area.  A fire protection system including a fire pump and associated generator was provided for the complex.

Project Data

Construction ProcessConstruction Management
Contract TypeSub-Consultant to Owner
Construction Cost$4,900,000 (Mechanical)
Completion2013
OwnerQualex Landmark Group
Suite Area13,475 m² (145,000 ft²)
Parking Area5,900 m² (63,500 ft²)