Mission Critical Services: The design criterion for data centre projects has been rapidly evolving over the past few years. The industry has moved from discussing 50 or 100 Watts per ft2 as a design criterion to high density loads such as 20 kW per rack. In the earlier days of data centre design the reliability and electrical design were the key factors designing a data centre. The evolution of server equipment to higher and higher densities has moved the key design issue from electrical power to mechanical cooling. In many cases the limiting factor on a data centre capacity is the mechanical cooling and MechWave Engineering is an expert in the field of data centre cooling. MechWave’s leadership as prime consultant allows the team to provide an integrated solution to a data centre design that provides maximum density while maximizing energy efficiency. |
|